{"id":53295,"date":"2019-06-17T08:50:22","date_gmt":"2019-06-17T12:50:22","guid":{"rendered":"https:\/\/paginiromanesti.ca\/?p=53295"},"modified":"2019-06-17T08:50:22","modified_gmt":"2019-06-17T12:50:22","slug":"noul-champlain-deschide-24-iunie","status":"publish","type":"post","link":"https:\/\/paginiromanesti.ca\/2019\/06\/17\/noul-champlain-deschide-24-iunie\/","title":{"rendered":"Noul pod Champlain se va deschide pe 24 iunie"},"content":{"rendered":"

Noul pod Champlain se va deschide \u00een direc\u021bia nord (pentru conduc\u0103torii auto care se vor \u00eendrepta spre Montreal) luni, 24 iunie, de ziua na\u021bional\u0103 a Quebecului.<\/h2>\n

Constructorii vor mai avea nevoie de o s\u0103pt\u0103m\u00e2n\u0103 pentru a putea deschide circula\u021bia pe pod \u0219i \u00een direc\u021bia sud, spre Brossard, pe data de 1 iulie, ziua na\u021bional\u0103 a Canadei, anun\u021b\u0103 presa canadian\u0103.<\/p>\n

Av\u00e2nd numele oficial Podul Samuel-De Champlain, noua construc\u021bia va avea o lungime de 3,4 kilometri \u0219i va avea o sec\u021biune rezervat\u0103 pentru transportul \u00een comun, inclusiv noul tren u\u0219or (REM).<\/p>\n

Podul trebuia livrat \u00een decembrie 2018 \u0219i ini\u021bial trebuia livrat \u00een 4,2 miliarde de dolari.<\/p>\n

Dup\u0103 1 iulie, vechiul pod va fi \u00eenchis circula\u021biei \u0219i va urma un proces lung \u0219i costisitor de demolare a acestuia.<\/p>\n

 <\/p>\n

 <\/p>\n","protected":false},"excerpt":{"rendered":"

Noul pod Champlain se va deschide \u00een direc\u021bia nord (pentru conduc\u0103torii auto care se vor \u00eendrepta spre Montreal) luni, 24 iunie, de ziua na\u021bional\u0103 a Quebecului. Constructorii vor mai avea nevoie de o s\u0103pt\u0103m\u00e2n\u0103 pentru a putea deschide circula\u021bia pe pod \u0219i \u00een direc\u021bia sud, spre Brossard, pe data de 1 iulie, ziua na\u021bional\u0103 a […]<\/p>\n","protected":false},"author":1,"featured_media":53296,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","enabled":false}}},"categories":[35],"tags":[2065,2061],"jetpack_publicize_connections":[],"jetpack_sharing_enabled":true,"jetpack_featured_media_url":"https:\/\/paginiromanesti.ca\/wp-content\/uploads\/2019\/06\/Design-Nouveau-pont-Champlain.jpg","jetpack_shortlink":"https:\/\/wp.me\/p9PoWe-dRB","_links":{"self":[{"href":"https:\/\/paginiromanesti.ca\/wp-json\/wp\/v2\/posts\/53295"}],"collection":[{"href":"https:\/\/paginiromanesti.ca\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/paginiromanesti.ca\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/paginiromanesti.ca\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/paginiromanesti.ca\/wp-json\/wp\/v2\/comments?post=53295"}],"version-history":[{"count":0,"href":"https:\/\/paginiromanesti.ca\/wp-json\/wp\/v2\/posts\/53295\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/paginiromanesti.ca\/wp-json\/wp\/v2\/media\/53296"}],"wp:attachment":[{"href":"https:\/\/paginiromanesti.ca\/wp-json\/wp\/v2\/media?parent=53295"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/paginiromanesti.ca\/wp-json\/wp\/v2\/categories?post=53295"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/paginiromanesti.ca\/wp-json\/wp\/v2\/tags?post=53295"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}